I had often driven along the
road that crosses over the Denver Sluice and seen this sign on the fence
outside the lock-keeper's office, but it wasn't until I attended the open-day
on Wednesday 16th July 2008 that I had a chance to read it.
My purpose in visiting the
complex was to find out what, if anything, the Environment Agency had done to
minimise the disruption to domestic and business life when the Wash Road is
flooded as it had been for long periods in the winter of 2006-7.
I went with a small party
that lunched first on the riverside terrace at the Jennyns Arms in warm
sunshine. Luckily we had chosen the first of the two open days - the next was
chilly, wet and miserable.
|
Our visit started here in a room
at the top of the Complex control building.
There were lots of Information
boards and several staff to explain the workings. We discovered that Denver
Sluice itself is actually just one of several sluices within the Denver
Complex site.
There's the AG Wright Sluice
(also known as the Head Sluice), the John Martin Sluice (also known as
Welmore Lake Sluice), the Residual Flow Sluice, the Diversion Sluice and the
Impounding Sluice. There was mention too of a Tail Sluice but I think that's
somewhere else; it is, as they kept stressing, very complex.
Luckily there were various
information leaflets and a map to take away for those of us who couldn't quite take it
all in at the time.
|
 |
 |
This display shows how
surplus water can be pumped via pipelines and natural watercourse from Denver
to Essex, the driest county in the UK with half the average national
rainfall.
Commonly known as The
Abberton Scheme after the reservoir south of Colchester which receives most
of the water, it is also referred to as The Ely Ouse to Essex Transfer Scheme
('EOETS').
We also discovered that the
operator of the Abberton Reservoir trades as Essex & Suffolk Water, but is
actually Northumbrian Water.
The EA official here is
explaining the operation in more detail to an intrigued visitor - the
webmaster of the Nordelph Website.
|
Past and Present Fenland
Drainage.
This interesting interactive
electronic map enabled us to see the courses of the man-made rivers and drains at
different periods in history, from pre 1600 to post 1959, by pressing an appropriate button.
|
 |
 |
We then donned yellow
waistcoats and joined a guided tour party.
We visited three (or was it
four?) sluices and learned (and in my case soon forgot) their names, how old they were,
how much water passed through them, how the doors and gates worked, and how
complicated it all was to operate them to satisfy the differing needs of very
diverse "interest groups" - an expression which includes residents of Welney
and those affected by flooding on the Wash Road.
Our guide, one of two
operators living on site, did his best to make the tour interesting, but as nothing was happening at the
time it was difficult for those of us who are not total sluice anoraks to pay
full attention right to the end.
We didn't see any buttons
pushed, levers pulled, wheels turned, "V" doors opened or closed, or sluice
gates raised or lowered.
We didn't even see Julie
Reinger from BBC TVs 'Look East' programme who presented her weather forecast
from the site later in the day.
|
|
The large gate on the right was a lock for large commercial craft but has been
permanently closed for many years; the gate on the left is the navigation
lock; the three arches between those gates house the huge timber 'V' doors,
known as the "little eyes", which should open to allow water from the Ely Ouse
to flow into the Tidal River.
However, they were so badly
silted up in the 2006-7 winter that they could not be opened. Some people
said this was one of the reasons why water stayed on the Ouse washes and on
the Wash Road at Welney for so long before being evacuated out to sea via the
Tidal River. I don't really understand that because "our" water doesn't flow
through this sluice. Maybe it's to do with silt raising the river bottom and
slowing down the flow. If you know, please
contact
The EA began to remove the
silt from the doors and repair them in the autumn of 2007 and work was to have been completed by June 2008. However, on the
day of our visit only one was operational, the other two still sealed off by
temporary gates. I understand work on the others should now be finished in
mid-August, and they should be fully operational in September.
|
 |
I took this photo nearly a year
earlier, in August 2007, showing the huge island of silt on the downstream
side of Denver Sluice.
In the later photo above, it looks as though the
amount of silt is less - but it's difficult to be certain
as the tide in this earlier photo is lower, so more silt would be exposed.
The photos are also taken from different positions & angles and with different
cameras, so direct comparison id not possible.
|
 |

|
Back to July 2008
The temporary barrier gates
known as stop-logs or damboards are still in place in front of two of the "V" doors.
Various air and water jetting
systems are being considered to keep the doors clear of silt in future, and trials may
begin next year.
|
|
For
the EA view on siltation and navigation see their
fact sheet
(a PDF document).
It reads as though written by Donald Rumsfeld, not only by the use of
the American spelling of metre, but because it is short on detail and long on
rhetoric and includes phrases such as "high highs" and "low lows".
For their view on siltation and flooding
see their
article in the 'Welney News'.
(Both these open in new windows) |
|
home and
introduction
|
contents & headlines |
reports & comment |
sports and
social |
information
centre |
local government |
links |
commerce |
other |